link ae888

Transport Ministry to prioritise funding for maintenance of Long Bien Bridge

The Ministry of Transport will prioritise funding for the maintenance and repair of Long Bien Bridge, an iconic structure in the Vietnamese capital.
Transport Ministry to prioritise funding for maintenance of Long Bien Bridge ảnh 1Long Bien Bridge, an iconic structure in the Vietnamese capital needs to have more funding for annual maintenance.(Photo: VNA)
Hanoi(VNA) - The Ministry of Transport will prioritise funding for the maintenanceand repair of Long Bien Bridge, an iconic structure in the Vietnamese capital.

Le Hoang Minh,Director of the Transport Infrastructure Department at the Ministry ofTransport, said that through inspection, the department noted that the bridge’smaintenance management unit, the Ha Hai Railway Joint Stock Company, stillensured safety amid funding difficulties.

“However, the department also has asked the management units to immediatelyreinforce the railings, fix potholes, and install warning signs so that peopleknow the current status of the bridge,” he said.

Regarding thefunding for maintenance this year, said "the ministry will give priorityto funding for the Long Bien Bridge right after the budget estimate isfinalised between the Ministry of Transport and Vietnam Railway Corporation.”

“Every year,the State budget still provides funding for maintenance at the highest levelpossible, to ensure safety for people," Minh said.

Particularly,the road surface was cracked, causing problems for traffic, Minh said, althoughthe bridge’s management unit has regularly maintained the surface to ensuretraffic safety.

The currentbridge was also very weak, so the construction of the concrete surface wasdifficult as workers are not able to use specialised vehicles.

“Our workershave to repair the bridge surface manually, leading to a decrease in thedurability of the road.”

Minh saidthat in order to repair and maintain Long Bien Bridge, it was necessary to havea large budget.

"Forexample, just repainting the entire bridge needs funding up to 70 billion VND (3million USD)."

"Currently,the bridge maintenance is still using the money of the railway industry, withlimited funds, so the bridge cannot be clearly improved."

Arepresentative of the Vietnam Railway Corporation (VNR) said that after nearly120 years of operation, due to bombing during the American War and the speed ofurbanisation, the bridge has become seriously degraded.

The VNR has been assigned by the Ministry of Transport to implement projects toreinforce and repair the bridge.

Every year,VNR still prioritises funding from capital sources for regular maintenance ofminor damage.

He admittedthat funding for national railway maintenance was limited, only meeting about36 percent of actual repair needs.

Phan TienDung, Deputy Head of the Infrastructure Division, VNR, said in advance of thedeterioration of the bridge, VNR sent a telegram to request the Ha Hai RailwayJoint Stock Company to have immediate temporary solutions.

Specifically,for all minor failures, this unit needs to check and include them in the 2021maintenance plan.

The VNR hasasked the management unit to use its funds to prioritise repairing the damageon the bridge surface, and installing warning signs at the two ends of thebridge, he said.

In additionto annual funding for repairs, the government and relevant ministries have toset up a separate project to repair the bridge in the form of an overhaul,according to Dung.

Long BienBridge was built between 1899 and 1902, by French architects Daydé & Pilléand opened in 1903.

Before Vietnam’sindependence in 1945, it was called Paul Doumer Bridge, named after the thenGovernor-General of French Indochina./.
VNA

See more

Representatives from the Central Committee of the Vietnam Youth Federation and TikTok Vietnam at the signing ceremony of cooperation agreement for the 2025-2029 period. (Photo: hanoimoi.vn)

“I Love My Country” media campaign launched

Running from August 4 to September 2, under the hashtag #TuHaoVietNam, the campaign invites participants in two categories: “I Love My Country” video clips and “I Love My Country” check-in photos.

With a tight 13-month deadline, the move is under a strategic and urgent policy to bridge educational gaps, train the local workforce, and shore up territorial sovereignty in some of the country’s most remote areas.
Illustrative photo (Source: VNA)

Tour boats in Ha Long Bay to completeဣ AIS installation by August 15

According to national technical regulations, AIS installation is mandatory for boats carrying more than 50 passengers. However, operators of smaller vessels (under 50 seats) in Ha Long Bay have voluntarily committed to completing installation by the deadline to enhance operational safety.
{dagathomo tructiep hôm nay}|{link link link ae888}|{dá gà thomo}|{trực tiếp đá gà thomo hom nay}|{sbobet asian handicap}|