link ae888

Traffic solutions for major intersection

Solutions to ease traffic congestion on the Phap Van intersection of Hanoi have been proposed by the Directorate for Roads of Vietnam.
Traffic solutions for major intersection ảnh 1The Phap Van intersection in the southern area of the capital city. (Photo: VNA)
Hanoi (VNA) - Solutions to ease traffic congestion on the Phap Van intersectionof Hanoi have been proposed by the Directorate for Roads of Vietnam.

ThePhap Van intersection has high traffic flow as its connects the Phap Van – Cau GieHighway with Ring Road 3 and the Nuoc Ngam coach station with the Giap Bat coachstation.

Trafficcongestion occurred over all traffic lanes that surround the intersectionduring peak hours and holidays, said Nguyen Van Huyen, Director of thedirectorate.

Thequality of the current transition lanes fall short of traffic demand, due todamaged road surface and obscured traffic signals, making it an urgent task torenovate the intersection and develop more transition lanes, he said.

Therenovation project for the intersection is currently in its second phase,aiming to construct 6 traffic lanes for motor vehicles, which are estimated tobe inaugurated at the beginning of 2018.

Anew turning lane will be developed so that vehicles can turn right from thefeeder road of the intersection’s interchange to a transition road from theThanh Tri Bridge.

Aswitch back curve will be developed under the Phap Van viaduct to reduce thenumber of vehicles taking the left turn at the intersection between the PhapVan – Cau Gie Highway and Ring Road 3 to enter the city.

Anew right-turn lane will be connected to the Phap Van – Cau Gie Highway to easetraffic congestion at the highway’s entrance that crosses Ring Road 3.

Theadministration also proposed improvements to the connection point between RingRoad 3 and National Highway 1 to make it easier for vehicles to turn right togo into the city’s centre, as well as connecting the right-turn lane from the TranThu Do street with the entrance lane of the Phap Van – Cau Gie Highway.

Thesolutions are estimated to cost 423 billion VND (18.6 million USD), of whichsome 256 billion VND (11.3 million USD) will be spent on site clearance.

Theywill be carried out under the build-operate-transfer (BOT) mechanism.-VNA
VNA

See more

Representatives from the Central Committee of the Vietnam Youth Federation and TikTok Vietnam at the signing ceremony of cooperation agreement for the 2025-2029 period. (Photo: hanoimoi.vn)

“I Love My Country” media campaign launched

Running from August 4 to September 2, under the hashtag #TuHaoVietNam, the campaign invites participants in two categories: “I Love My Country” video clips and “I Love My Country” check-in photos.

With a tight 13-month deadline, the move is under a strategic and urgent policy to bridge educational gaps, train the local workforce, and shore up territorial sovereignty in some of the country’s most remote areas.
Vietnamese Ambassador to China Pham Thanh Binh speaks at the exchange programme. (Photo: VNA)

ꦓ Chinese children explore Vietnam at Beijing exchange

Whether they grow up to become journalists, diplomats, or professionals in other fields, these children can one day become bridges of friendship and cooperation, telling new and inspiring stories of Vietnam – China relations, said Ambassador Pham Thanh Binh.
{dagathomo tructiep hôm nay}|{link ae888 city 165}|{dá gà thomo}|{trực tiếp đá gà thomo hom nay}|{sbobet asian handicap}|