link ae888

Hot weather continues to hit central provinces

The central provinces of Thanh Hoa, Nghe An and Ha Tinh continued to suffer high temperatures, badly affecting local production and daily life.
Hot weather continues to hit central provinces ảnh 1A farmer in Thanh Hoa province in her dried rice field. (Photo: vov.vn)

ThanhHoa (VNA)
– The central provinces of Thanh Hoa, Nghe An and Ha Tinhcontinued to suffer high temperatures, badly affecting local production anddaily life.

Thousandsof hectares of rice have been lost because of the prolonged hot weather, whilemany rice fields have been abandoned due to lack of water. Saline intrusion wasaffecting many areas.

ThanhHoa province had planted more than 112,000ha of rice out of total 116,000ha.

Accordingto the Thanh Hoa Irrigation Sub-department, water levels in 241 out of 610reservoirs have fallen, with some reservoirs drying up.

Atpresent, 7,500ha of rice lacked water. The local authorities had to installhundreds of pumps to save the crops.

Incoastal districts of Quang Xuong and Tinh Gia, the saline intrusion occurredalong the Y and Hoang Rivers. Pumping water from the rivers to rice fields wasrisky.

Inthe difficult situation, the farmers were asked not to continue planting riceon the remaining fields.

DangTien Dung, Deputy Director of the provincial Department of Agriculture andRural Development, said: “The remaining water was just used for the currentrice fields. For areas at high-risk of water shortage, the local farmers shouldchange to other crops.”

Meanwhile,in Ha Tinh province, the hot weather and drought had caused many crops towither.

HuongKhe and Huong Son districts are the localities facing the worst drought.

Thelocal government and agriculture and rural development department had carriedout measures on drought control such as dredging canals and digging wells.

Similarto Thanh Hoa and Ha Tinh provinces, Nghe An had faced seven bouts of hotweather since earlier this year.

InMay and June, temperatures hit 39.5 to 41.5 degrees Celsius. The heatwavescaused severe drought and water shortages, causing difficulties for residents.

Sofar, about 13,000ha of rice crop had lacked water because hundreds of dams,lakes and reservoirs was drying up./.
VNA

See more

An Giang province closes the Tra Su Sluice to block flooding, helping downstream farmers complete harvest of their summer-autumn rice and begin sowing the autumn-winter crop on schedule. (Photo: VNA)

🀅 Mekong Delta flooding higher than normal this year

Floodwater levels in the Cuu Long (Mekong) Delta are high and will continue to rise this month, especially in upstream areas, according to the hydraulic works management and construction department of the Ministry of Agriculture and Environment.
Bui Chinh Nghia, Deputy Director of the Forestry and Forest Protection Department and Director of the CITES Vietnam Management Authority, speaks at the meeting. (Photo: VNA)

🐼 ASEAN members join hands to prevent endangered wildlife trafficking

Regional solidarity and cooperation are the key factor for the effective implementation of wildlife protection regulations. Only through sustainable cooperation, innovative approaches, and collective action can biodiversity be safeguarded for the present and future generations, an Vietnamese official has said.
An overview of the session to announce the International Court of Justice's advisory opinion on the obligations of States in respect of climate change. (Photo: VNA)

ಞ Vietnam contributes to international court's advisory opinion on climate change

As a key member of the core group of 18 countries, initiated by Vanuatu, Vietnam engaged in advocating for the UN General Assembly’s Resolution N.77/276, requesting for the ICJ’s advisory opinion. Following the resolution's adoption, Vietnam fully participated in all procedural steps for the first time, from submitting written proposals to presenting directly at the court’s hearings.
Hanoi plans to expand the charging station network for better efficiency. (Photo: VNA)

🐼 Hanoi to roll out policies supporting green transport transition

Under the plan, from 2025 to 2026, the city will complete mechanisms and policies to support businesses in switching to green vehicles, expand the electric and green-energy bus network, and build charging stations. The targeted proportion of green buses is set at 10% in 2025 and 20–23% in 2026.
{dagathomo tructiep hôm nay}|{link ae888 city 165}|{dá gà thomo}|{trực tiếp đá gà thomo hom nay}|{sbobet asian handicap}|